1.
THE HOOVER DAM
MADE BY JOSH GOWING
2.
WHO?
The Boulder Dam was made by over 21,000 workers
The masterminds were men named Henry J. Kaiser and Gordon Kaufmann
Kaiser had already built many dams
Kaufmann was a German architect
3.
WHEN?
The Hoover Dam was started in 1931
It was finished in 1936
4.
WHERE?
The Hoover Dam is located in Boulder City, Nevada
5.
WHY?
The Hoover Dam was built to control the natural power of the Colorado River
Many had previously dreamed of constructing hydroelectric power stations
6.
HOW?
The dam was built using stacked concrete cubicles, kind of like giant Legos
The architect who designed the dam also designed a cable system
This system was used to put concrete barrels right where they were needed
In order to construct the dam, the Colorado River was diverted first
This was done using two giant redirection tunnels
7.
FUN FACTS
The dam
Josh Gowing
×
Error!