1 of 10

Slide Notes

DownloadGo Live

Burj Khalifa The Tallest Tower

Published on Nov 18, 2015

No Description

PRESENTATION OUTLINE

THE TALLEST TOWER

BURJ KHALIFA
Photo by capelle79

AND HERE IS WHAT IT

LOOKS LIKE IN THE NIGHT

Untitled Slide

WHERE IS IT LOCATED

  • It is located in United Arab Emirates Asia

WHAT MATERIALS DID THEY USE

  • The materials that were required were 330,00
  • cubic meters of concrete
  • also was made with glass, steel, and aluminum

HOW LONG DID CONSTRUCTION TOOK ( WHEN START, WHEN END)

  • They started construction in January, 2004
  • to January, 2010 ( 5 years )

WHAT WAS THE BUILDING USED FOR

  • It is used for communication, hotel residence,
  • and office and residential

THE POPULATION OF THE CITY ITS LOCATED IN

  • First, the city's name is Dubai, United Arab Emirates
  • and it's population is 2.106 million people there
  • THATS ALOT

ONE INTERESTING FACT ABOUT BURJ KHALIFA

  • During peak of construction, at least 12,000
  • workers worked on the construction site per day

THANK YOU FOR WATCHING

THATS ALL ABOUT THE TALLEST TOWER, BURJ KHALIFA