PRESENTATION OUTLINE
THE 4.1 MILE LONG BRIDGE WAS BUILT ON THE COLUMBIA RIVER
CANTILEVER THROUGH TRUSS BRIDGE
CONSTRUCTION BEGAN NOV. 5, 1962
IT TOOK 4 YEARS 9 MONTHS AND 22 DAYS TO BUILD AT A COST OF $24,000,000.
THE ASTORIA-MEGLER BRIDGE WAS FEATURED IN MOVIES SUCH AS:
IT WAS THE FINAL LINK IN THE MEXICO TO CANADA HIGHWAY SYSTEM.
IT HOSTS 7,100 VEHICLES A DAY.
THE BRIDGE HAD TO BE BUILT TO
THE CONCRETE PIERS HAD TO WITHSTAND FLOOD SPEEDS OF
"Astoria Megler Bridge." Wikipedia. Wikimedia Foundation, 11 Nov. 2012. Web. 14 Nov. 2012.
"Astoria Megler Bridge." Funbeach. N.p., n.d. Web. 14 Nov. 2012.